All serviced, ready to go!

image

List of work done so far.
Air filter
Oil filter
Fuel filter.
Spark plugs.
Cap and rotor arm.
Made HT leads from Beru components.
Coolant flush and change.
New radiator cap.
Brake fluid reservoir removed, cleaned and brake fluid change.
Timing belt and tensioner.
Set valve clearances (miles out!)
Blasted, primed and powder coated upper cam belt cover.
Replaced rubber fuel line sections under the bonnet.

Going to do a few more jobs in the coming week or so, slow Polish the bodywork, full valet.
Gearbox oil change.
Replace under body fuel lines.
Check brakes, replace front discs and pads with vented 239×20 black Diamond items.